Lull 1044C-54 Series II Service Manual User Manual

Page 239

Advertising
background image

Boom and Transfer

31200079

6-97

27. (Ref. Fig. 6-102) Install grease hose assembly on rear of inner boom

section as follows:

a. Install two (2) elbows (Item 3) on inside of inner boom section

making sure elbows are in correct position for grease hose to be
connected.

b. Install two (2) bulkhead adapters (Item 4) on rear of inner boom

section (Item 2).

c. Connect two (2) grease hoses (Item 1) to bulkhead adapters.

Torque swivel nuts on grease hoses to 130–150 in-lbs.

d. Connect grease hoses to elbows. Torque swivel nuts on grease

hose to 130–150 in-lbs.

e. Install grease fittings (Item 5) and grease fitting covers (Item 6) on

bulkhead adapters (Item 2). Torque grease fittings 2–3 turns past
finger tight.

28. Turn inner boom section over and place it on work stands in upright

position.

Fig. 6-103: Upper Chain Installation – Inner Boom Section

29. (Ref. Fig. 6-103) Install upper chain assembly on inner boom section

as follows:

a. Install rear chain anchor (Item 9) on inner boom section with two

(2) lockwashers (Item 6) and capscrews (Item 7). Torque
capscrews to 280 ft-lbs.

b. Install upper chain (Item 4) on chain anchor with shoulder bolt

(Item 8) and lock nut (Item 5). Torque lock nut to 108 in-lbs.

c. Install chain adjustment anchor (Item 1) on upper chain with

shoulder bolt (Item 3) and lock nut (Item 2). Torque lock nut to 108
in-lbs.

J

1248

8

6

1

7

2

3

4

5

9

4

#

Description

1

Chain Adjustment Anchor

2

Lock Nut

3

Shoulder Bolt

4

Upper Chain

5

Lock Nut

#

Description

6

Lockwasher

7

Capscrew

8

Shoulder Bolt

9

Rear Chain Anchor

Advertising