Lull 1044C-54 Series II Service Manual User Manual

Page 241

Advertising
background image

Boom and Transfer

31200079

6-99

Fig. 6-105: Upper Chain and Hose Reel Assembly – Middle (Forward) Boom

33. (Ref. Fig. 6-105) Install upper chains and hose reel assembly on

middle (forward) boom section as follows:

a. Install two (2) hose reels (Item 7) to rear of boom section with hose

reel pins (Item 10). Secure each pin to boom section with
lockwasher (Item 9) and capscrew (Item 8). Torque capscrews to
216 in-lbs.

Fig. 6-106: Rear Slide Pad Installation

34. (Ref. Fig. 6-106) After applying thread locking compound to the

capscrews, install remaining slide pads (Items 2 and 12) and shims
(Item 10) on rear of boom sections with lockwashers (Item 7) and
capscrews (Item 8). Torque slide pad capscrews to 180 in-lbs.

Note: See “Shimming Procedures” on page 6-48 for details in

determining the number of shims that will be required when
performing Steps 34 and 37.

#

Description

1

Upper Chains

2

Lock Nut

3

Upper Chain Anchor

4

Capscrew

5

Lockwasher

#

Description

6

Chain Anchor Rod

7

Hose Reel

8

Capscrew

9

Lockwasher

10 Hose Reel Pin

J1

2

5

7

1

2

3

4

5

6

7

8

9

2

10

3

4

7

8

5

6

11

2

10

10

12

8

7

8

7

3 4

5

6

#

Description

1

Inner Boom Section

2

Upper Slide Pad

3

Slide Pad Retainer

4

Flatwasher

5

Lockwasher

6

Capscrew

#

Description

7

Lockwasher

8

Button-Head Socket Capscrew

9

Middle (Forward) Boom Section

10 Shim
11 Middle (Rear) Boom Section
12 Side Slide Pad

Advertising