Lull 1044C-54 Series II Service Manual User Manual

Page 268

Advertising
background image

Boom and Transfer

6-126

31200079

e. Slowly lift the boom and transfer carriage assembly up and away

from the machine. Place the assembly on support blocks on a firm
level surface.

Fig. 6-130: Transfer Carriage Installation

13. The following steps are required if the boom is being removed

separately from the transfer carriage.

a. Remove the boom hoist cylinder (See page 6-13).

b. Remove the rear carriage tilt cylinder (See page 6-25).

c. Remove the boom (see this section).

d. Use sling(s), crane, or other suitable means to support the transfer

carriage assembly.

WARNING: To avoid personal and/or equipment damage, support the

transfer carriage assembly before removing any additional
mounting hardware. Use suitable blocking and lifting devices
when removing heavy machine components.

e. (Ref. Fig. 6-130) Remove the four (4) each nuts (Item 1) and

lockwashers (Item 2) securing the two (2) front slide blocks (Item 4)
to the transfer carriage (Item 5). Remove the four (4) capscrews
(Item 3) and the slide blocks.

f.

(Ref. Fig. 6-130) Loosen the two (2) setscrews (Item 6) in each
spindle nut (Item 7).

J

1154

1

#

Description

1

Nut

2

Lockwasher

3

Capscrew

4

Front Slide Block

5

Transfer Carriage

6

Setscrew

#

Description

7

Spindle Nut

8

Spacer Washer

9

Thrust Washer

10 Spindle
11 Roller Bushing
12 Transfer Roller

2

4

3

7

6

8

9

10

11

12

5

Advertising