Section 2 - Pre-Operation and Inspection

2-1

31200354

SECTION 2 - PRE-OPERATION AND INSPECTION

2.1

PRE-OPERATION CHECK AND INSPECTION

Note: Complete all required maintenance before operating unit.

The pre-operation check and inspection, performed at beginning of each work shift
or at each change of operator, should include the following:

1. Cleanliness - Check all surfaces for leakage (oil, fuel or battery fluid) or foreign

objects. Report any leakage to the proper maintenance personnel.

2. Structure - Inspect the machine structure for dents, damage, weld or parent

metal cracks or other discrepancies.

3. Safety Decals - Ensure all safety decals are legible and in place. Clean or

replace as required. See page 2-3 for details.

4. Operation and Safety Manuals - Operation & Safety Manual and AEM Safety

Manual (ANSI only) are located in cab manual holder.

5. Walk-Around Inspection - See page 2-10 for details.

6. Fluid Levels - Check fluids, including fuel, hydraulic oil, engine oil, transmission

fluid and coolant. When adding fluids, refer to Section 7 - Lubrication and
Maintenance
and Section 9 - Specifications to determine proper type and
intervals. Before removing filler caps or fill plugs, wipe all dirt and grease away
from the ports. If dirt enters these ports, it can severely reduce component life.

7. Attachments/Accessories - Ensure correct capacity charts are installed on the

telehandler. If provided, reference the Operation & Safety Manual of each
attachment or accessory installed for specific inspection, operation and
maintenance instructions.

WARNING

FALL HAZARD. Use extreme caution when checking items beyond your normal
reach. Use an approved ladder.

OAH1000

PARENT METAL CRACK

WELD CRACK