15 front roller and bushing replacement, Front roller and bushing replacement -16, Section 11.3.15, “front – Lull 944E-42 Service Manual User Manual

Page 256: Roller and bushing replacement.”)

Advertising
background image

Transfer Carriage

11-16

944E-42

11.3.15

Front Roller and Bushing
Replacement

Note: The attachment should remain attached to the
quick attach.

1. Park the machine on a firm, level surface, level the

machine, fully retract the boom and transfer
carriage, level the boom, place the transmission
control lever in (N) NEUTRAL, engage the park
brake and shut the engine OFF.

2. Lift the boom with a hoist to remove pressure off the

front rollers. There should be a gap between the
rollers and the rails.

3. Place a Do Not Operate Tag on both the ignition key

switch and the steering wheel, stating that the
machine should not be operated.

4. Open the engine cover. Allow the system fluids to

cool.

5. Properly disconnect the batteries.

6. Remove the front roller pin (8), front roller and

shims (9). Count and label their positions for later
replacement.

Note: It is reccomended to replace both rollers at the
same time. Roller replacement includes bearings.

7. Inspect front rollers (9) for cracks and flat wear

spots. If front roller is damaged, replace it with a new
front roller.

Note: It is reccomended to replace both bearings at the
same time.

Note: DO NOT apply any grease or anti-seize
compound to bushing or roller pin.

8. Inspect the front roller bearings (10). If they are worn

and visibly shake on the roller pin, replace with new
self-lubricating bearings.

9. Insert roller pin (8), front roller and shims (9) in their

previously labeled positions.

10. Coat the capscrews with Loctite

®

242 (blue). Replace

capscrew, washer, spacer and locknut to secure pin
(8) on transfer carriage. Torque capscrew to
43 - 78 lb-ft (59 - 106 Nm).

11. Repeat steps 8 through 10 for the other front roller.

12. Properly connect the batteries

13. Close and secure the engine cover.

14. Inspect rear rollers. (Refer to Section 11.3.12, “Front

Roller Gap Check.”)

15. If required, perform rear rollers shimming. (Refer to

Section 11.3.13, “Front Roller Shimming.”)

MU1791

8

9

MU3211

10

Advertising