4 first boom section installation, First boom section installation – Lull 944E-42 Service Manual User Manual

Page 40

Advertising
background image

Boom

3-10

944E-42

3.3.4

First Boom Section Installation

1. Use a suitable overhead lifting device and sling and

carefully lift the first boom section into place on the
transfer carriage.

2. Install the boom pivot pin (5) with the previously

used hardware. DO NOT coat the boom pivot pins
with anti-seize compound.

3. Add or remove shims (6) as required until a

maximum total gap of 0.09 in (2,3 mm) is obtained.
Balance the number and thickness of shims equally
on both sides. If an additional (odd) shim must be
added to obtain the proper gap, add to the right side
of the boom.

4. Raise each slave cylinder into position, coat each

mount pin (4) and bore hole with anti-seize
compound and install the mounting pins. Loctite

®

242™ and torque each capscrew to 18-31 lb-ft
(13-23 Nm). DO NOT stretch or damage the slave
cylinder hydraulic hoses.

5. Use a suitable overhead lifting device and sling

attached to the lift/lower cylinder. Remove slack from
the sling and raise the cylinder into its mount boss
on the underside of the boom.

6. Coat the lift/lower cylinder pivot pin and bore hole

with anti-seize compound. Install the pin and secure
with capscrew. Loctite

®

242™ and torque to

70-77 lb-ft (95-105 Nm).

7. Remove the slings from the lift/lower cylinder, and

remove the blocks or supports from beneath the
cylinder.

8. As required, install the hydraulic clamps on the

boom and secure the attachment tilt and auxiliary
hydraulic tubes and hoses within the clamps on the
boom and frame. Torque clamp capscrews to
4-8 lb-ft (6-11 Nm).

9. Install new o-rings into the fittings. Lubricate o-rings

with clean hydraulic oil.

10. Uncap and connect the previously labeled hydraulic

fittings to their appropriate locations.

6

5

MU0371

4

Advertising