7 valve plate, 1 valve plate removal, 2 valve plate installation – Lull 944E-42 Service Manual User Manual

Page 72: Valve plate, Valve plate removal, Valve plate installation

Advertising
background image

Cab and Covers

4-12

944E-42

19. Install the mirrors and all other cab components as

needed, if removed.

20. Unblock the wheels.

21. Close and secure the rear door.

4.7

VALVE PLATE

4.7.1

Valve Plate Removal

1. Park the machine on a firm, level surface. Allow

sufficient overhead and side clearance for cab
removal. Level the machine, fully retract the boom,
lower the boom, place the travel select lever in the
(N) NEUTRAL position, engage the park brake and
shut the engine OFF.

2. Place a Do Not Operate Tag on both the ignition key

switch and steering wheel, stating that the machine
should not be operated.

3. Properly disconnect the batteries.

4. Attach a suitable lifting device to the cab step and

remove the slack.

5. Remove the four capscrews and washers from the

cab step and lower to the ground.

6. Support the valve plate (1) with a suitable lifting

device.

7. From under the valve plate, remove the two

capscrews and washers (2) securing the plate to the
cab mount frame. Lower the valve plate.

8. Disconnect the two tethers (3) from the cab

mounting frame.

9. Remove the two cotter pins, washers and valve plate

hinge pins (4).

10. Disconnect, label, cap and plug all hydraulic hose

connections and fittings.

11. Disconnect and label all electrical connections.

12. Remove the valve plate from the machine.

13. Service individual valve plate components as

required. Refer to Section 8.7.2, “Main Control
Valve.”

4.7.2

Valve Plate Installation

1. Use a suitable lifting device to lift the valve plate into

position under the cab.

2. Uncap and reconnect the previously labeled

electrical and hydraulic hose connections. To
properly reconnect all hydraulic connections refer, to
Section 2.2, “Torque Charts.”

3. Replace the hinge plate pins, washers and cotter

pins to secure the valve plate to the cab mount
frame.

4. Reconnect the two tethers to the cab mount frame.

5. Lift the valve plate and secure with two capscrews

and washers.

6. Attach a suitable lifting device to the cab step and lift

into position under the cab.

7. Replace the four capscrews and washers securing

the cab step. Torque the capscrews to 43 - 78 lb-ft
(59 - 106 Nm).

8. Properly disconnect the batteries.

MU3821

1

2

3

MU4931

4

Advertising