Section 5. service - (le, mrt, rts, es, rt), 1 description, Section 5 - service - (le, mrt, rts, es, rt) – JLG LSS Scissors User Manual

Page 37: Description -1, Load sense module -1

Advertising
background image

SECTION 5 - SERVICE - (LE, MRT, RTS, ES, RT)

3124288

– JLG Lift –

5-1

SECTION 5. SERVICE - (LE, MRT, RTS, ES, RT)

5.1 DESCRIPTION

The system consists of the LSS Module, four Shear Pin
Load Cells (sensors), Wire Harness, and various brackets
and fasteners. The LSS Module is mounted beneath the
platform on a bracket. The Shear Pin Load Cells mount

between the platform and the arm structure in such a way
that all support force for the platform is applied through
them (for measurement). The four Shear Pin Load Cells
plug directly into the LSS Module. The Wire Harness con-
nects the LSS Module to the Host Control System.

1

2

3

4

6

5

NOTE ORIENTATION OF PIN ARROW,

POINTED AWAY FROM PLATFORM

8

7

1. Load Cell (Typical 4 Corners)
2. System Interface - Power & Digital - J1
3. System Interface Communication - J2
4. Indicator Light

5. Rear Right Load Cell - J8
6. Rear Left Load Cell - J7
7. Front Right Load Cell - J6
8. Front Left Load Cell - J5

Figure 5-1. Load Sense Module

Advertising