ERICO Cable to Ground Rod Vertical Splice Rod Down User Manual

ERICO Accessories for electrical

Advertising
background image

1.5" [38 mm]

Prior to making a connection, read and follow the full instruction sheets IPP, IPX,

IPRNS (included only with molds used on rail property not to rail) and the special

instructions below.

Mark rod 1.5" [38 mm] from end to be welded.

1.

Position mold on rod with bottom of mold even with mark (As shown above).

2.

Gap cable as noted on mold tag.

3.

Use clamp or locking pliers on rod and cable. This will help prevent mold from

4.

sliding down rod and will help hold the cable in position.

TECHNICAL SUPPORT:

www.erico.com

IP7087_C

INSTRUCTION SHEET

1 OF 1

© 1995, 2012, 2014

ERICO International Corporation





WARNING:

ERICO products shall be installed and used only as indicated in ERICO product instruction sheets and training materials. Instruction sheets are available at

1.

www.erico.com and from your ERICO customer service representative.

ERICO products must never be used for a purpose other than the purpose for which they were designed or in a manner that exceeds specified load ratings.

2.

All instructions must be completely followed to ensure proper and safe installation and performance.

3.

Improper installation, misuse, misapplication or other failure to completely follow ERICO's instructions and warnings may cause product malfunction, property

4.

damage, serious bodily injury and death.

SAFETY INSTRUCTIONS:

All governing codes and regulations and those required by the job site must be observed.

Always use appropriate safety equipment such as eye protection, hard hat, and gloves as appropriate to the application.

CADDY, CADWELD, CRITEC, ERICO, ERIFLEX, ERITECH, and LENTON are registered trademarks of ERICO International Corporation.