Kees AIR MIXERS User Manual

Installation guide, Kees, inc

Advertising
background image

KEES, INC.

Products for Sheet Metal HVAC, Food Service, & Architectural Construction Industries

400 S. INDUSTRIAL DRIVE - P.O. BOX L - ELKHART LAKE, WISCONSIN 53020 - (920) 876-3391 - FAX (920) 876-3065

Mix

x

er Section

Installation Guide

Mix

x

er Section Installation, Operation And Maintenance

Installation
The Mix

x

er Section is manufactured complete with Air Mix

x

er and flanges to match stan-

dard air handlers. Gasketing between Mix

x

er Section and other air handling equipment

should be used to seal against air leakage. The Mix

x

er Section shall be match drilled in

the field for proper fit up to standard air handling equipment.

Operation
Once installed, the Mix

x

er Section, including Air Mix

x

er, requires no operating instruc-

tions. The section utilizes a fixed position Air Mix

x

er with no moving parts.

Maintenance
The Mix

x

er Section is constructed of 18 gauge galvanized iron with heavy gauge alu-

minum (.080”) Air Mix

x

er and does not require any special maintenance under standard

HVAC operation.

MSIG 02/96

Advertising