Commissioning, 1 before switching on, 7commissioning – Lenze 8400 User Manual

Page 241

Advertising
background image

Commissioning

Before switching on

7

241

EDS84ASC552 EN 9.1

7

Commissioning

Note!

ƒ

Please observe the general safety instructions ( 12).

ƒ

Please observe the notes regarding residual hazards ( 18).

7.1

Before switching on

Note!

ƒ

Comply with the respective switch-on sequence.

ƒ

In case of trouble during commissioning, the following supports you:

– The ”Diagnostics” chapter

– The online help in the »Engineer«

– The software manual of the prevailing device version

In order to avoid injury to persons or damage to material assets, check ...
... before switching on the mains voltage:

ƒ

Check the wiring for completeness, short-circuit and earth fault

ƒ

The ”emergency switching off” function of the entire plant

ƒ

The motor circuit configuration (star/delta) must be adapted to the output voltage

of the controller

ƒ

The in-phase connection of the motor

ƒ

The direction of rotation of the incremental encoder (if available)

...the setting of the most important drive parameters before controller enable to ensure

the following:

ƒ

The V/f rated frequency is adapted to the motor circuit configuration!

ƒ

The drive parameters relevant for your application are set correctly!

ƒ

The configuration of the analog and digital inputs and outputs are adapted to the

wiring!