2 terminal control, Terminal control, Commissioning – Lenze 8400 User Manual

Page 247: Quick commissioning terminal control, Highline/topline

Advertising
background image

Commissioning

Quick commissioning

Terminal control

7

247

EDS84ASC552 EN 9.1

7.2.2

Terminal control

Commissioning steps
1. Wiring of power terminals
Make use of the Mounting Instructions supplied with the frequency inverter to wire the

power terminals according to the requirements of your device.
2. Wiring of control terminals.

– StateLine

Analog inputs at X3

Assignment

Terminal control

X3

O1U GA

A1I A1U AR

1k

...

10k

W

W

0...10 V

"

A1U

Setpoint selection

10 V (=100 %):

1500 min

-1

(with 4-pole motor)

Wiring of the digital inputs at X4

Assignment

Terminal control

24E

DI1

DI2

DI3

DI4

RFR

X4

DO1

GIO

24I

+

_

DC 24 V

RFR

Controller enable: RFR = High

Reset error:

High  Low (edge-controlled)

DI1

Fixed frequency 1 ... fixed frequency 3, see

table below

DI2
DI3

DCB

DI1 ... DI4: all active = High

DI4

Direction of rotation left/right (CCW/CW)

– HighLine/TopLine

Analog inputs at X3

Assignment

Terminal control

"

X3

A2I

O2I

A2U

O2U

A1I

O1I

A1U

O1U

AR

GA

1k

10k

...

W

W

0 ... 10V

A1U

Setpoint selection

10 V (=100 %):

1500 min

-1

(with 4-pole motor)

Wiring of the digital inputs at X5

Assignment

Terminal control

24E

DI1

DI2

DI3

DI4

RFR

DC 24 V

X5

DI5

DI6

DI7

GI

24I

RFR

Controller enable: RFR = High

Reset error:

High  Low (edge-controlled)

DI1

Fixed frequency 1 ... fixed frequency 3, see

table below

DI2
DI3

DCB

DI1 ... DI4: all active = High

DI4

Direction of rotation left/right (CCW/CW)

3. If you can be sure that the frequency inverter is in the default state (Lenze setting),

you can skip the following step. If not, establish the Lenze setting of the frequency

inverter. We recommend to use the keypad for this.

Advertising
This manual is related to the following products: