Trim-Tex Demarcation User Manual

Demarcation bead installation instructions

Advertising
background image

Demarcation Bead

Installation Instructions

INC.

Contact us today! Phone: 800-874-2333 / Fax: 800-644-0216 / www.trim-tex.com

Designed for clean rooms.

Create a separation between
drywall finish and a different
substrate, such as an epoxy floor.

Perfect for straight line separation
between surface treatments.

INSTALLATION INSTRUCTIONS (Epoxy Floor Example)

Measure the height you would like to separate your 2 surfaces and the length at which you will need to cut the bead. Cut
and dry fit the bead into place. Install the Demarcation Bead with 847 Spray Adhesive and mesh tape. For the strongest
bond, spray both the back of the bead and the surface you want the bead attached to. Pour the epoxy floor up to the nose
of the Demarcation Bead. Once epoxy floor has dried, mud and sand the other side of the Demarcation bead.

Finishing Compound

Mesh Tape

Epoxy Floor

LENGTH

20

10'

DM10

Instrucciones de Instalación

Del Esquinero de Demarcación

INC.

Diseñado para habitaciones mas
definidas.

Crea una separación entre un
acabado de tabla roca con un
sustrato diferente, como, por
ejemplo, piso epóxico.

Perfecto para separaciones rectas
de tratamientos de superficie.

Instrucciones de Instalación (Ejemplo de piso epóxico)

Tome la medida que le gustaría separar las dos superficies y la distancia al cual ocuparía cortar el esquinero. Corte y ponga
el esquinero en su lugar. Instale el Esquinero de Demarcación con Adhesivo en Aerosol 847 y cinta de malla. Para una
mejor adherencia, aplique 847 en el esquinero y en la superficie donde lo quiere aplicar. Agregue el piso epóxico hasta la
nariz del Esquinero de Demarcación. Ya que el piso epóxico se haga secado, ponga el compuesto y lije el otro lado del
Esquinero de Demarcación.

Compuesto para
acabado

Cinta de Malla

Piso Epóxico

LENGTH

20

10'

DM10

Advertising