Determining mounting order – Rockwell Automation 2093-xxxx Kinetix 2000 Multi-axis Servo Drive User Manual User Manual

Page 38

Advertising
background image

Publication 2093-UM001A-EN-P — March 2007

38

Mounting the Kinetix 2000 Drive System

Refer to the Kinetix 2000 Power Rail Installation Instructions, publication
2093-IN004, when installing your power rail.

Determining Mounting
Order

Mount IAM, AM, and SM modules in the order (left to right) shown in the
figure. A slot filler (SF) must occupy any unoccupied slots. Mount axis
modules according to power utilization (highest to lowest) from left to right
starting with the highest power utilization. If power utilization is unknown,
position axis modules (highest to lowest) from left to right based on Amp
rating.

Module Mounting Order

ATTENTION

To avoid damage to the power rail during installation, do not remove
the protective boots until the module for each slot is ready for
mounting.

Power Utilization or Amp Rating

Lowest

Integrated Axis Module

2093-AC05-MP5

Axis Module

2093-AM01

Axis Module

2093-AMP2

Axis Module

2093-AMP2

Shunt Module

2093-ASP06

Slot Filler Module

2093-PRF

Seven-axis Power Rail Module 2093-PRS7

Highest

Advertising