Bally Refrigerated Boxes Walk-In Installation Manual User Manual

Installation manual, Pre-engineered walk-in coolers and freezers

Advertising
background image

UPDATED: 6/2014

Instruction Manual IM-268-11 2014© Bally Refrigerated Boxes, Inc. 1

Pre-Engineered Walk-In Coolers and Freezers

Installation Manual



Part One: The Bally Walk-In
1. Preparation for Installing the Walk-In

3

2. Operation of the Bally Speed-Lok

3

Part Two: Installation

1. Positioning

4

2. Walk-Ins with Screeds

4

3. Installing Less-Floor Walk-Ins

4

4. Door Installation

5

5. Installing With-Floor Walk-Ins

5

6. Vertical Panel Installation

5

7. Installing Multi-Compartment Walk-Ins

6

Part Three: Other Important Information
1. Preventing Vapor Leaks

6

2. Partition Wall Caulking

7

3. Air Gap Circulation Recommendation

7

4. Making holes for Refrigeration Tubing and Electrical Lines

7

5. Making Electrical Connections to Entrance Doors and Vapor-proof Lights

7


Part Four: Completing the Bally Installation

Completing Installation of the Walk-In

8

1-800-24BALLY | [email protected]

Advertising