Bally Refrigerated Boxes Modular Buildings User Manual

Modular buildings, Installation manual

Advertising
background image

REV: 1/2013

Instruction Manual IM-238-94 2013 © Bally Refrigerated Boxes, Inc. 1



Modular Buildings

Installation Manual

1. Introduction

2

2. Marking Installation Area

2

3. Speed-Lok Operation

2

4. 'Z' Base Trim

3

5. Less Floor Walk-Ins

3

6. Floor Panel Installation

4

7. With-Floor Installation

4

8. Door Panel Installation

4

9. Multi-Compartment Walk-Ins

5

10. Interior Steel

5

11. Shear Plates

5

12. Batten Strips

5

13. High Wind Securing

6

14. Outdoor Considerations

6

15. Door Rain Shield

6

16. Wall Standards

6

17. Panel Penetrations

7

18. Prevent Vapor Leaks

7

19. Grounding

8

20. Broken or Stripped Locks

8



1-800-24 BALLY

Bally Refrigerated Boxes, Inc.

www.ballyrefboxes.com

Advertising