Tools and parts, Prepare for rack-mount installation, Workbench or tabletop installation – Cisco OL-7822-06 User Manual

Page 8: Tape measure (optional), Level (optional), Number 1 phillips screwdriver, Number 2 phillips screwdriver, 1/4-inch flat-blade screwdriver, 1/4-inch hex wrench, Grounding kit (shipped with the sce 1000)

Advertising
background image

1-2

Cisco Service Control Engine 1000 2xGBE Quick Start Guide

OL-7822-06

Chapter 1 Prepare for Installation

Workbench or Tabletop Installation

Tools and Parts

Use the following list of tools and parts as a checklist for preparing for installing the SCE 1000 platform:

Appropriate cables to connect the SCE 1000 to the network and console terminal

Tape measure (optional)

Level (optional)

Number 1 Phillips screwdriver

Number 2 Phillips screwdriver

1/4-inch flat-blade screwdriver

1/4-inch hex wrench

Grounding kit (shipped with the SCE 1000)

12 AWG or 2.5 mm copper installation wire with hex or loop connectors for DC power leads (DC
power only) Ring terminals must be UL approved and suitable for 12 AWG wire.

AC power cords (AC power only, shipped with SCE 1000)

Rack-mounting kit (shipped with SCE 1000)

Spare screws for changing bracket position

Prepare for Rack-Mount Installation

Before you begin the rack-mounting tasks, determine the type of rack—four-post or two-post—that you
will be using.

Workbench or Tabletop Installation

Figure 1-1

Tabletop Installation of the SCE 1000 Platform

For a workbench or tabletop installation, verify the following before installing the SCE 1000 platform:

The SCE 1000 platform is off the floor and has adequate ventilation.

Cisco S

CE 100

0

Series

2xGBE

LINK RX

TX

RX

MM

TX

LINK RX

TX

RX

MM

TX

GBE-1

SUB

LINE

NET

PWR B

STATUS

PWR A

BYPASS

10/100/

1000

LINK/

ACTIVE

10/100/

1000

LINK/

ACTIVE

AUX

CONSO

LE

MNG 2

MNG 1

1

2

92967

Advertising