Cable Routing Procedures for Dell™ PowerEdge™ R515 Systems

Page 9

Figure 10: Replacing the Outer Power Supply

Section 4: Cabling a PowerEdge™ R515 System Installed in Static Rails

NOTE: The CMA is compatible with the sliding rails only, not the static rails.

1. Follow the instructions contained in the

Rack Installation Instructions

found in the static rail kit

to install the server into a two-post or four-post rack.

2. Install the hook and loop straps provided in the rail kit through the slots in the rear brackets of

the rails as described in the

Rack Installation Instructions

.

3. Connect all applicable cables to the rear of the system and verify that all connections are

secure.

4. Using the hook and loop straps, bundle the cables and secure them to either the left rail or

right rail as described in the

Rack Installation Instructions

. See Figure 11 for an example of data

cables that are secured to the left rail and power cables that are secured to the right rail (as
viewed from the rear of the system).

Figure 11: Cabling a System Installed in Static Rails

Disconnected inner
CMA bracket