Figure 11

DC Power Supply Grounding Stud Location and Connection on the Cisco ASR 1004 Router

Step 1

Make certain that the chassis ground is connected before you begin installing the DC power supply.

Step 2

Locate the ground stud on the DC power supply for the GND connection which must be installed first and replace the
ground stud components in the following order:

b.

Washer

c.

Grounding lug with wire

d.

Kepnut screw

Step 3

Tighten the Kepnut screw to complete the installation.

Figure 11

shows the installed DC power supply ground stud.

Step 4

Ground the other end of the grounding wires to an appropriate grounding point at your site.

Step 5

Repeat Steps 2 through Step 4 on the second DC power supply.

Wiring the DC-Input Power Source

Note

The color coding of the DC-input power supply leads depends on the color coding of the DC power source at your site.
Typically, green or green/yellow is used for ground (GND) on the power supply. Negative –48V black is on negative (–)
terminal and red is used for RTN on the positive (+) terminal. Make certain the lead color coding you choose for the
DC-input power supply matches lead color coding used at the DC power source.

Step 1

Make sure the power switch circuit breaker is in the Off position.

Step 2

Locate and remove the plastic cover from the terminal block.

1

DC power supply grounding stud

3

DC power supply chassis grounding stud location

2

Grounding stud screws

4

Earth ground symbol

280034

3

4

2

1