Installation step 2, Install the header bracket, Fasten the header bracket to the wall – Craftsman 139.53664SRT2 User Manual

Page 14: Fasten the header bracket to the ceiling

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Installation Step 2

Install the Header Bracket

You can attach the header bracket either to the
wall above the garage door, or to the ceiling.

Follow the instructions which will work best tor
your particular requirements.

Fasten the Header Bracket to the Wall

Center the bracket on the vertical guideline with
the bottom edge of the bracket on the horizontal

line as shown (with the arrow pointing toward the

ceiling).

Mark either set of bracket holes (do not use the
holes designated for ceiling mount). Drill 3/16" pilot

holes and fasten the bracket securely to a structural

support with the hardware provided.

2x4 —

Slmctural

Support

Wall

Mounllrvg Holes

Lag Screws

5/16‘x9xl-5/8’

The nail hole is lor positbnihg

only. You must use lag screws to

mount the header bracket.

Optional

Wall Mounting

Holes

Highest

Point ol Travel

(ot Garage Door)

Vertical

Center

Line

fiart

__

dware Shown Actual Size

_______________________________

I

1

1

1

1

1

1

1

1

>

I Lag Screw

5/16"-9Xl-5/8"

Fasten the Header Bracket to the Ceiling

Extend the vertical guideline onto the ceiling as
shown.

> Center the bracket on the vertical mark, no more

than 6" from the wall. Make sure the arrow is

pointing toward the wall. The bracket can be
mounted flush against the ceiling when clearance

is minimal.

* Mark holes designated for ceiling mount only. Drill

3/16" pilot holes and fasten bracket securely to a
structural support with the hardware provided.

Ceiling Mounting Holes

Finished

Ceiling

The nail hole is lof positioning only.

You must use lag screws to mount

the header bracket.

14

Advertising