BoonDocker Adjustable Actuator User Manual

BoonDocker Air equipment

Advertising
background image


BoonDocker Adjustable Actuator- Install and Operation Instructions.

Installing your Adjustable Actuator

The Adjustable Actuator is comprised of three main components.

1. Actuator Base Plate

2. Actuator Drive/with knurled ring

3. Actuator Head Assembly

Begin your install by removing your existing actuator and attaching the Actuator Base Plate to the
Actuator bracket.

The next step is to thread the Actuator Drive onto the base plate. You will thread it down until it comes
in contact with the base plate.

Next loosen the Actuator head and thread it in two to three turns until you feel slight pressure against the
spring. Note: This will set the minimum boost pressure range. If this is too tight your minimum boost
pressure will be increased.

Then connect your boost line to the vacuum port on the Actuator Head assembly.



Page 1

Advertising