Insideglz-frm-assembly, Inside glaze screw spline frame assembly – Oldcastle BuildingEnvelope FG-3000 User Manual

Page 13

Advertising
background image

INSIDE GLAZE SCREW SPLINE FRAME ASSEMBLY

MIN. CLEARANCE

5/16" CLEARANCE

MIN. CLEARANCE

1/8" SPACE

7/16"

3/8"

Most of the extrusions in this system are the same, only the

sill and its anchors are different. Note that the tapes used

for sealing the horizontals to mullions are located in a differ-

ent manner.
The sill is designed so that sill anchors may be cap sealed

before the frame is installed. The frame is installed over the

the sill with twist-in anchors. This prevents any additional

screws from penetrating the sill and causing leaks under the

sill.

Multiple units require the use of split mullions. A minimum of

7/16" clearance between the jamb and sill end dam must be

provided. This will allow a minimum of 3/8" clearance to

move first unit sideways so the second unit with the same

clearance will clear the interlocking legs of the expansion

mull. Adjust frame locations before running perimeter seals.

OBE recommends using FG-2188 vinyl filler to improve

the perimeter seal.

OBE does not recommend the shear block or stack

method of assembly for inside glazing.

12

JULY 2011

Phone: 1-866-OLDCASTLE (653-2278)

Web Address: www.oldcastlebe.com

F L U S H G L A Z E S E R I E S 3 0 0 0 I N S T A L L A T I O N M A N U A L

Advertising