Tycon Power ENC-ST-23X14X12 User Manual

Tycon Power Power suppliers

Advertising
background image

ENC-ST-23X14X12 Qwik Install

STEP 1:

Add Grounding jumper wire between 2 copper studs and use copper wash-

ers and nuts to secure.

STEP 2:

Install a hole plug in drain hole in bottom right corner of the enclosure.

STEP 3:

Add wire feedthrus into the bottom connector

plate and attach the connector plate.

STEP 4: If pole mounting the enclosure, assemble the pole mount kit to the back of the enclosure and mount

the enclosure to a pole using 6 hose clamps (not included). The enclosure can also be wall mounted using the 4 holes in

the back of the enclosure.

STEP 5:

Insert the battery platform in the bottom of the enclosure. The battery platform

has cutouts so wires can be routed under the battery as needed.

Advertising