Maintenance, Oeb 6.20 & 10.10 - sequence of operations – Cleveland Range Convotherm Combination Oven-Steamer Electric 6.20 User Manual

Page 69

Advertising
background image

CLEVELAND RANGE OEB 6.20/10.10

SEQUENCE OF OPERATIONS

When using these instructions refer to the OEB 6.20/10.10 wiring schematic.

1

When incoming power (220 VAC) is connected to the combi, 220 VAC is sent to

a

The contacts 2,4 and 6 of the Safety Contactor (KO)

b

The terminals 2 and 3 of the Control Power Switch (S1)

2

When the Control Power Switch (S1) is turned on (closed)

a

The red light on the switch is energized.

b

Incoming power (220 VAC) is sent through the 2A fuse (F1.1) to

• The 12 vdc power supply (G1)

◊ 12vdc is sent to terminals 3 and 4 of the connector X10 on the Control

Board (A10)

• Terminal 1 of connector X12 on the Control Board (A10)

• Terminal 10 of connector X13 on the Control Board (A10)

• The return of the Supply is sent to terminal 7 of connector X13 on the Control

Board (A10)

c

With 220 VAC to the Control Board (A10) The Operation Board (A11) is

energized
• An alarm will sound for one second

• All the LED’s and the display will energize one at a time.

• “STARTING” will be displayed for 3 seconds

• “please wait” will be displayed

• The international model number will be displayed

• The time and date will be displayed and this will continue until the on/off

switch is depressed.

3

When the ON/OFF is depressed with the combi in the steam mode

a

After a date change (the first time the combi is turned on) the display will ask

“Generator Flush?”. If no answer is given in 10 seconds or a yes is indicated the
flush will begin.
• 220 VAC is sent from terminal 1 of connector X13 on the Control Board

(A10) to the Generator Pump (M4).

• As the water level drops below the probes the fill solenoid (Y3) will energize.

This rocking of the water will help flush scale from the generator.

• Then the pumps will be energized again

• When the condensate box is heated to 140 degrees F at the B3probe, 220 VAC

is sent from terminal 5 of connector X12 to the condenser valve (Y1) until the
temperature drops.,

b

The display will show the set temperature and set time when the flush cycle is

complete.

c

The Control Board (A10) will check the water level by looking for a ground at

terminals 1 and 2 on connector X15. These are connected to the high and low
probes (B1) in the steam generator.

61