Installation procedures, Pre-installation procedures – Hardy HI LPRE05 Shear Beams User Manual

Page 18

Advertising
background image

HI HLPS SERIES LOAD POINT ASSEMBLY

Page 12

For scales that must meet NIST Class 3 (OIML Class
3) specifications:

1.

Maximum base plate angle variation: 0.2
degrees.

2.

Maximum top plate angle variation 0.5
degrees.

For scales that must meet accuracy specifications =>
0.1%

1.

Maximum base plate angle variation 0.2
degrees

2.

Maximum top plate angle variation 1 degree.

Installation Procedures

Pre-Installation
Procedures

Step 1.

Position the base plates with load cells on
the support surfaces and line them up in
accordance with the basic principles for
positioning. (See Principle #2, pg. 6)

Step 2.

We recommend scribing or marking a cen-
terline on the top plate. (See Fig. 15)

FIG. 15: MARKING TOP PLATE FOR

INSTALLATION

Advertising
This manual is related to the following products: