Intertape Polymer Group (IPG) NOVAWRAP ASPIRE User Manual

Reinforced construction paper, Novawrap, Aspire

Advertising
background image

REINFORCED CONSTRUCTION PAPER

TM

i build with

SPECIFICATIONS

1- 8 0 0 - 5 6 5 -2 0 0 0

w w w.itape.com | E-mail: [email protected]

TM

i tape with

INSTALLATION INSTRUCTIONS

• NovaWrap

Aspire

should be installed after the wall framing is completed and before the windows and doors are installed.

• NovaWrap

Aspire

should be installed on the outside of the insulation cavity, preferably over approved exterior sheathing board or

insulation with the printed side installed so that it faces out.

• NovaWrap

Aspire

should start at an outside corner, ensuring the roll remains vertical, unroll the material across the face of the

sheathing making sure the roll remains plumb and that the bottom edges of NovaWrap

Aspire

extend over the foundation by 2

inches (5 cm).

• The application should start at an outside corner extending around the starting point corner by at least 6 inches (15 cm).
• Attach NovaWrap

Aspire

so that it is tight and flat.

• NovaWrap

Aspire

can be fastened with either large head nails with sufficient length to penetrate the stud framing, or wide crown, 1

inch long (2.5 cm) staples, or 1 inch diameter (2.5 cm) plastic washer head nails.

• For installation over a foam plastic insulation board, the carriers shall be fastened with 3/8 inch (0.95 cm) diameter head nails long

enough to penetrate the framing member without crushing the foam board.

• Fasteners should be spaced every 6 inches (15 cm) at the perimeter of the wall and around the door and window openings and

between 12 inches (30 cm) to 18 inches (45 cm) along the vertical framing members.

• Material higher on the wall should overlap materials lower on the wall.
• Horizontal overlaps should be at least 6 inches (15 cm), and vertical flaps at least 4 inches (10 cm).
• When installing around window or door openings, use an X-cut from corner to corner, pulling the flaps in, folding excess material (or

trimming excess material), fastening securely through all layers to a framing membrane.

• IPG

®

brand Contractor Grade Sheathing Tape (or equivalent) may be used to secure NovaWrap

Aspire

to window flanges, door

jambs, sill plate foundation, and all vertical/horizontal seams.

• When used over wood-based sheathing in exterior plaster applications, 2 layers of product shall be applied over sheathing in

accordance with Section 2510.6 of the IBC or Section 2506.4 of the UBC, as applicable, except for cementitious coatings or exterior
insulation and finishing systems, application shall be in accordance with the evaluation report on the exterior coating.

• When installed In Canada, NovaWrap

Aspire

should be installed in accordance to Article 9.27.3.3 of the NBC 2010 and

manufacturer’s current instructions.

• NovaWrap

Aspire

should be installed with a minimum 1/2 inch (1 cm) air space between the sheathing membrane and cladding,

unless otherwise specified.

• A concealed airspace exceeding 1 inch (2.5 cm) in width must contain proper fire stopping in accordance with Subsection 9.10.16 of

the NBC 2010.

• Although NovaWrap

Aspire

is stabilized with respect to degradation from sunlight, it should not be left exposed to sunlight

indefinitely.

• IPG

®

recommends that NovaWrap

Aspire

should be covered with cladding and the wall cavity closed within 120 days (60 days when

installed in Canada) of installation.

SAFETY PRECAUTIONS

• CAUTION! NovaWrap

Aspire

is slippery and should not be used in any applications where it can be walked on.

• IPG

®

recommends that kick jacks or scaffolding be used for exterior work above the first floor.

• If ladders are used, extra caution should be taken to use them safely by following the requirements set out in ANSI Standards 14.1, 14.2, and

14.5 for ladders made of wood, aluminum and fiber glass, respectively.

NovaWrap

Aspire

INSTALLATION INSTRUCTIONS

M

AD

E IN

CANA

DA

FA

BR

IQUE AU CAN

AD

A