5 how to install the balance – KERN & SOHN IEX 100K-1MEU User Manual
Page 8
5
How to install the balance
• Prepare the installation site for the IEX balance in a professional manner.
• Ensure that the installation site is dry, level and firm.
• The permissible operating temperate range is from -10°C to +40°C
• The floor base for the installation of the platform balance must be firm enough
for supporting the maximum weight allowed for the load plus the platform
balance.
• The IEX balance has a display unit connected to the platform.
• The display unit is designed for attachment to the table or installation on the
wall with the help of a holder.
• The balance should be unpacked outside the hazardous zone.
• Remove all transport locking devices after unpacking:
CAUTION!
• To prevent electrostatic charge, connect the balance to earth.
• The contact slots for the wires are marked with the icon „ “.
• Prior to transport, prepare a PE conductor for electrostatic connection to earth of
the display unit.
• The PE conductor should end in a loop that is screwed to the display unit with the
help of nuts (M4).
• To ensure that the loop is fixed permanently and in contact with the display unit,
use a lock washer.
• The PE conductor should be of yellow and green colour and provide a sectional
surface of 4mm².
Transport Securing
8