5 how to install the balance – KERN & SOHN IEX 100K-1MEU User Manual

Page 8

Advertising
background image

5

How to install the balance

• Prepare the installation site for the IEX balance in a professional manner.

• Ensure that the installation site is dry, level and firm.

• The permissible operating temperate range is from -10°C to +40°C

• The floor base for the installation of the platform balance must be firm enough

for supporting the maximum weight allowed for the load plus the platform
balance.

• The IEX balance has a display unit connected to the platform.

• The display unit is designed for attachment to the table or installation on the

wall with the help of a holder.

• The balance should be unpacked outside the hazardous zone.

• Remove all transport locking devices after unpacking:



CAUTION!

• To prevent electrostatic charge, connect the balance to earth.
• The contact slots for the wires are marked with the icon „ “.

• Prior to transport, prepare a PE conductor for electrostatic connection to earth of

the display unit.

• The PE conductor should end in a loop that is screwed to the display unit with the

help of nuts (M4).

• To ensure that the loop is fixed permanently and in contact with the display unit,

use a lock washer.

• The PE conductor should be of yellow and green colour and provide a sectional

surface of 4mm².



Transport Securing

8

Doc.No.IEX-BA-e-1412