PULSE ShowerSpas 1009 Lanai User Manual

Lease, Ollowing, Nstructions

Advertising
background image

Lanai Model #1009

P

LEASE

R

EAD

T

HE

F

OLLOWING

I

NSTRUCTIONS

C

OMPLETELY

B

EFORE

B

EGINNING

!


Our goal is to ensure that your installation goes smoothly and safely. Please read these
safety instructions carefully and follow the recommendations for plumbing and
mounting. If, after reading this instruction manual, you determine you do not have
the necessary skills and/or tools, we then recommend a licensed plumbing
contractor complete the installation.


You will need the following tools:

Soft pencil or felt pen to mark tile
Tape Measure
Level
Drill (Preferably cordless)

A Reciprocating Saw w/metal cutting blade
(Sawzall®)
Channel Locks or adjustable wrench
¼”

Masonry Drill Bit

New Construction/Extensive Remodel

New Finished Wall Surface

1. Prior to sheetrock, stub-out ½” hot and cold supply lines beyond the finished wall

surface, 3” on center. The height of the Stub-outs is completely dependent upon the
desired mounting height of the Lanai Showerspa. For a person 5’8” – 6’2” we
recommend the stub-outs be 45” from the finished floor.

1

2. After the finished wall surface has been completed, make certain the water is completely

turned off to both hot & cold supply lines of the Shower. Connect the 90° male threaded
fittings to the stub-outs maintaining ¼” – ½” space between the fitting and finished wall.
The open end of the threaded male fitting should point down.

3. Using the back panel (housing) of the Showerspa as a template, mark the location of the 3

mounting bars. Make sure the back panel (housing) is level. For a person 5’8” – 6’2” tall,
we recommend the top two mounts be approximately 74” from finished floor height

2

.

Before drilling holes for the mounts, make certain the Showerspa will rest flat against
finished wall surface at the desired mounting height with the supply lines connected.

4. Drill ¼” holes through the wall surface using a masonry bit. Drill slowly through wall

surface to avoid cracking and chipping. Insert anchor and securely screw mounting bars
to the wall. Before connecting hot and cold supply lines, mount the Showerspa on the
wall, checking the height, and making sure the Showerspa feels secure.

5. Connect hot and cold water supply lines to male threaded pipe, do not over-tighten.

Before mounting the Showerspa, check the fittings to make sure they are secure. Turn on
water and check for leaks. When fittings are leak-free mount Showerspa on wall.

6. Seal around the body of Showerspa with a bead of silicone.

1

The desired mounting height of the Showerspa determines the height of the ½” stub-outs. The stub-outs

must be located at a height allowing the supply lines to be connected and the body of the Showerspa to rest
flat against the finished wall.

2

This height may vary depending on several factors (i.e. location of supply lines, interference from

Showerspa plumbing, personal preference, etc.).

Advertising