Rev-A-Shelf 5149 Series User Manual

5149 series waste container installation template, 20 min, Front edge of paper to back of door

Advertising
background image

5149 Series Waste Container

Installation Template

Recommended Screw and Pilot

Hole Location (5) Places

T-5149-1213

Front edge of paper

to back of door.

1)

Pre-drill mounting holes in the locations marked on this Template using a 3/32” drill bit. Be sure the template is centered left to right. The front edge of the template should be aligned with the

back of the door.

2)

Use the #8 x ¾” Phillips head screws provided to secure the unit to the floor. The slide system can be separated if necessary to aid in installation, but removal is not required. (See FIG 1 and FIG 2)

3)

Ensure that the door mounting brackets allow the mounting screws to engage a part of the door that is at least 3/4” thick. (On a 5-panel door, this would be the outer side pieces, or styles) Inset doors

would move the brackets toward the center of the unit while full overlay doors would require the brackets to move outward. (See FIG 3) Use the double sided tape provided to temporarily attach the

door to the mounting brackets.

4)

Carefully open the unit, being sure not to disengage the double sided tape. Once the unit is open, use the #6 x ½” flat head screws to permanently attach the door to the unit. All (8) screws must be

used for proper function. Space screws at opposing corners as much as possible.

Door Adjustment

Vertical mounting slots have been used in the bracket that attaches directly to the door. Use these slots for vertical adjustment. (See FIG 4)

Horizontal adjustment is achieved by loosening all 4 of the 3/8” nuts that connect the two brackets and moving the door left to right as needed. (See FIG 4)

For door tilt adjustment, loosen the 4 #3 phillips head screws below the skirt and adjust. The rear screws are slotted to allow the door to pivot at the front of the bracket. (See FIG 5)

Keeping the front screws “snug” will aid in adjustment.

Fig 4

Fig 5

PARTS LIST:

PULLOUT CHASSIS

WASTE CONTAINER CHASSIS

WASTE CONTAINER(S)

(8) #6 X 1/2” FLAT HEAD SCREWS

(5) #8 X 3/4” PAN HEAD SCREW

DOUBLE SIDED TAPE

TOOLS REQUIRED:

ESTIMATED ASSEMBLY

TIME:

20 MIN

CARE AND MAINTENANCE:

CLEAN WITH A DAMP CLOTH

AND WIPE PARTS DRY

3/32”

Fig 2

Fig 3

Fig 1

Rotate metal retainer clip and slide

clip out to pop spring off of ball-stud.

Press release lever behind side skirt on each

side by sliding up or down depending on

which side. Unit will seperate with both levers

disengaged.

Door thickness must be at

least 3/4” where screws attach

Mounting screws must engage

3/4” thick material minimum.

Adjust bracket left to right before

attaching door with double-sided

tape.

For horizontal

adjustment loosen 4

3/8” nuts and move

to desired position

Use vertical slots

for vertical door

adjustment

Door tilt adjustment screws

*Use this side for

Double 35 & 50 Qt.

Front of Unit

Center of Cabinet

Many of our products feature installation videos. Visit Rev-A-Shelf.com for more details.

Advertising