SeaLand VacuFlush 4806 Toilet User Manual

SeaLand Accessories for water

Advertising
background image

Toilet Requirements:
• 2 GPM (7.6 lpm) or higher water flow rate at toilet
• 1/2-inch (12.7 mm) water line with 1/2-inch NPT fitting (to connect to toilet water supply)
• 12 VDC or 24 VDC through a fuse or circuit breaker of sufficient size to protect wiring. Circuit

board fuse resets by turning power off and on. Refer to installation codes for proper wire sizes.

VacuFlush

®

4806 ToileT iNsTallaTioN GuiDe

® Registered; ™ Trademark of Dometic Corporation

© Dometic Corporation

600345375 12/12

Dometic corporation, sanitation Division

13128 State Rt. 226

Big Prairie, OH 44611-0038 USA

1-800-321-9886

Electrical

Amp draw (average)

2 amps at 12 V DC; 1 amp at 24 V DC

Fuse

2-amp internal fuse (resettable)

Water

Supply

Fitting

0.5 in. NPT

Flow rate

2.0 gpm/7.6 lpm minimum required at toilet

Discharge

Size

1.5 in./38 mm ID PVC pipe or sanitation hose

Horizontal run

50 ft./15 m maximum to vacuum source

Vertical run

6 ft./1.8 m maximum to vacuum source

Required

components

Electric flush switch

Dometic VFS or VFP switch (purchased separately)

Vacuum source

VacuFlush vacuum generator or

VacuFlush holding tank system (purchased separately)

Specifications subject to change without notice.

Toilet installation specifications

1. Carefully unpack toilet and place it in the approximate position intended. Assure that adequate

clearance is available for opening the seat and lid. Check the front and sides of the toilet to
insure that it will set flat against the floor.

2. Insert 0.75-in. (19 mm) spacer between toilet and wall, and reposition toilet against spacer

(fig.

1

), making sure back of toilet is parallel to back wall.

3. Mark floor at bottom front of toilet (fig.

2

). Remove toilet and 19 mm spacer, then place floor

mounting template where toilet was originally positioned, aligning front edge of template with
mark on floor representing front edge of toilet.

4. Mark all hole centers through template (fig.

3

).

5. Remove template from floor. Drill all access and fastener holes as indicated on template

(fig.

4

). If electrical wires and water supply are being routed through the wall, be sure to drill

those two holes only through the wall.

6. Determine the best location for the flush switch panel. It is recommended that the flush switch

be near the toilet but not hidden by the toilet lid in the “up” position. Avoid a location suscep-
tible to direct water spray. Cable provided with flush switch must reach from switch location to
connection in toilet base. Follow instructions provided with flush switch to create access hole.

7. Insert the discharge funnel into the hole with the outlet pointing in the direction of the

discharge plumbing (fig.

4

). Mark the floor through the eight countersunk mounting holes in

the flange. Remove the funnel and drill the eight pilot holes with an 11/64-inch (4 mm) drill bit.

8.

Route the discharge hose from the vacuum generator or vacuum tank up through the dis-

charge funnel hole. Lubricate the inside of the hose and outside of discharge funnel outlet

with silicone grease and install the hose onto the funnel outlet. Secure the connection with
two stainless steel hose clamps (fig.

5

).

9. Insert four T-bolts into the discharge funnel from the underside. Insert the discharge funnel with

connected hose into the discharge hole and secure to the floor with the eight #12x1-1/2-inch flat
head screws provided (fig.

6

).

10. Install the flange gasket over the T-bolts (fig.

7

).

11. Install flange adapter with words “THIS SIDE UP” facing up. Tighten adapter to discharge funnel

using four flat washers and hex nuts. Tighten in criss-cross pattern (fig.

8

).

12. Route 0.5-inch (13 mm) diameter water line from the fresh water source through the 1.5-inch

(38 mm) hole in the wall or floor and attach a 1/2-inch NPT fitting (fig.

8

).

Note
An accessible shut-off valve should be placed in the water line to the toilet for maintenance
or repair.

13. WITH ELECTRICAL POWER OFF, route electrical cables/wiring from vacuum generator and

power source through 1.5-inch (38 mm) hole (fig.

8

). (Refer to wiring diagram on separate

toilet model’s parts list. If wiring connector shown here is not being used, refer to wiring diagram
to make proper connections).

14. Install flush switch according to its instructions and route electrical cable through the 1.5-inch

(38 mm) wiring hole at the toilet.

15. Secure the toilet mounting brackets to the floor using the #14 x 2 ½-inch (65 mm) hex washer

head screws provided. Be sure to mount the brackets as shown on the template (fig.

9

).

Note
Do not completely tighten hex-head screws to floor – allow brackets to slightly
slide. Brackets will tighten when fastening toilet to brackets.

16. REMOVE THE RED PROTECTIVE INSERT FROM THE FLANGE ADAPTER. Set the toilet in front

of the flange adapter. Connect the flexible water hose to the 1/2-inch NPT fitting on the inlet
water line. Connect the cable/wiring from vacuum generator and power source to the toilet’s
vacuum generator-power source cables/wiring (fig.

10

). Connect the cable/wiring from flush

switch to the toilet’s flush switch-status panel cable/wiring (fig.

11

).

caution!
DO NOT ATTEMPT TO SLIDE TOILET OVER THE FLANGE ADAPTER. THE TOILET MUST
BE SET DOWN INTO THE FLANGE ADAPTER TO PREVENT POSSIBLE DAMAGE.

17. Lubricate the O-ring around the bottom of the toilet base with silicone grease. Pick up the toilet

and insert plastic toilet base assembly into flange adapter (fig.

12

). Make sure mounting brack-

ets on floor do not interfere with bottom of ceramic toilet. If the mounting brackets interfere,
adjust bracket position accordingly.

18. Making sure that toilet mounting holes align with brackets, insert the two plastic flange bushings

into the toilet mounting holes and secure the toilet to the mounting brackets with the two flat
head wood screws provided (fig.

13

). Be sure to drive fasteners into mounting brackets at a

downward angle.

19. Press the decorative screw covers over the flange bushings (fig.

14

).

20. Turn on electrical and water supplies, and test toilet for proper operation..

1

3

5

8

2

4

6

9

14

10

12

13

11

ThRouGh-The-Wall

DiaGRaM

FlooR

toilet

centerline

water line location

1 in. (25 mm)

1/4 in.

(6 mm)

2 in.

(51 mm)

electric

cable

location

Note
Choose an inlet configuration for the electrical
wiring and water lines - through the rear wall
or through the floor. Refer to the Through-the-
Wall diagram to plan access holes if that is the
intended application.

7

iMPoRTaNT: The preferred floor flange installation method is to mount the discharge funnel

directly on the finished floor.

DISCHARGE FUNNEL

CERAMIC TOILET BASE

- REAR VIEW

FLOOR

SUBFLOOR

3/4 in.

(19 mm)

Advertising