Initial operation, Ready screens – Sonics GXE User Manual

Page 19

Advertising
background image

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

I N S T R U C T I O N M A N U A L • M O D E L G X E P O W E R S U P P LY

18

INITIAL OPERATION

After the power supply is turned on (as described on previous page), follow

these steps:

1. Make sure that all necessary preparations have been made with regard to

the ultrasonic system and tooling, and that the items to be welded are in

position.

2. Press and hold the TEST button. While depressing the TEST button,

check the LCD display. Make sure the bar graph indicator on the LCD

display (a series of vertical lines that register to the 0 to 100% load meter

scale – see example below) does not exceed 20%.

During the testing process, keep in mind that the ultrasonics are only

activated as long as the TEST button is depressed – once you release the

TEST button, ultrasonics is terminated.

A bar graph indicator reading of above 20%, signals that there may be a

problem with the stack. Check your assembly and re-test.

3. The power supply is now ready for operation.

Frequency Display

The TEST key can also be used to display the running ultrasonic frequency.

Refer to page 24 for more information.

READY SCREENS

In addition to the start-up ready screen (shown on page 17), there are 2 other

“ready” screens. The system must be displaying one of the 3 ready screens

in order for welding to commence. Welding cannot be initiated from any

other display. The other 2 ready screens are as follows:

Alarm Screen

0045 Watts

NOTE: The TEST and

Load Meter check

should always be done

for all cold start-ups,

and for any start-up after

the system has been idle

for 20 minutes or more.

*Alarms*

Time: – –

Energy: – –

Go To Top Of Document

Advertising