Prior to operation

Connect gauge head by means of the VACUU•BUS line to a controller CVC 3000 or VNC 2 or to a

vacuum gauge DCP 3000.

Connect the gauge head to the vacuum chamber by means of the small flange connection or a hose

connection. Avoid contamination (oil/oil mist) of the gauge head when generating the vacuum with an

oil-sealed vacuum pump.

Do not mount the gauge head directly at the oil-sealed pump but close to the vacuum process. The

diameter of the vacuum lines should be as large as possible.

Inside a vacuum system where evaporation occurs (e.g., rotary evaporator) the vacuum is not uni-

form (e.g., a condenser acts as pump or the vacuum in the pipeline is lower than in the system).

Therefore choose carefully the position where to connect the gauge head.

Condensate and deposits at the gauge head falsify the measurement result.

If residues occur or when working with aggressive or condensable substances, install a gas washing

bottle in front of the pressure gauge head.

Mount the gauge head in such a position that condensate can not flow into it.

If necessary, clean the gauge head.

VACUU•BUS

Readout of the pressure transducer via VACUU•BUS line by he controller CVC 3000 or VNC 2 or by

the vacuum gauge DCP 3000 using VACUU•BUS protocol (see instructions for use of vacuum control-

lers CVC 3000 or VNC 2 or of vacuum gauge DCP 3000). Maximum cable length inside buildings: 30m.

Extension cable VACUU•BUS 2m: order-no. 612552.

With the devices CVC 3000 and DCP 3000 it is possible to adjust and to configure the pressure trans-

ducer VSK 3000. (A configuration of the VSK 3000 e.g., to a different VACUU•BUS address, is required

if more than one pressure transducer are connected to a CVC 3000 or DCP 3000.)

Additional instructions for use regarding the configuration of pressure transducers or other

VACUU•BUS components are available upon request.

(1)

(2)

(3)

Installing the PTFE-tubing connection (PTFE-tubing ID: 8mm, OD: 19mm):

Unscrew the flange (using a 17 mm open-end wrench, if necessary) to expose the compression fitting

(1). Slip the compression nut, and then the ferrule, onto the PTFE-tubing (2). Slide the PTFE-tubing onto

the compression fitting on the VSK 3000 gauge head, and tighten the compression nut firmly finger-tight

(3).