1 break-in procedure, 2 using the auto/off/manual switch (figure 2.1), 1 "auto" position – Carrier ASPASICCA007 User Manual

Page 11: 2 "off" position, 3 "manual" position, Break-in procedure, Using the auto/off/manual switch

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Section 2 — Operation

Carrier Air-cooled 7 kW, 12 kW and 15 kW Generators

OPERATION

6ti

Servicing of the battery is to be performed or supervised
by personnel knowledgeable of batteries and the
required precautions. Keep unauthorized personnel

away from batteries.

When replacing the battery, use the following type of

battery: Group 26 12-volt DC, negative ground battery

with a rating of 350 cold-oranking amps minimum for 7

kW; 525 cold-cranking amps minimum for 12 and 15 kW

at -17.8° C (0° F) minimum. When using a maintenance-
free battery, it is not necessary to check the specific
gravity or electrolyte level. Have these procedures

performed at the intervals specified in the “Service
Schedule.” A negative ground system is used. Battery

connections are shown on the wiring diagrams. Make
sure the battery is correctly connected and terminals are
tight. Observe battery polarity when connecting the

battery to the generator set.

2.1

BREAK-IN PROCEDURE

Once the unit has been installed and all electrical checks

have been made, it is strongly recommended that the

following “Break-in Procedure” be completed to ensure
correct generator operation in the future.

1. Set the generator’s AUTO/OFF/MANUAL switch to

AUTO.

2.

Turn OFF the utility power supply to the transfer

switch using the means provided (such as a utility
main line circuit breaker).

3. The unit will start, and the transfer switch will transfer

to standby.

4. Using the transfer switch’s built-in emergency load

center, turn on circuits to load the generator to
approximately 25% rated load and run the unit for
one hour.

5. Run the unit for one hour at 50% rated load.
6. Run the unit for one hour at 75% rated load.
7. Run the unit for one hour at 100% rated load.
8. Turn ON the utility power supply to the transfer

switch, which will allow the transfer switch to transfer
back to utility power. The unit will continue to run for
one minute and then shut down.

9. Allow the unit to cool.

10. Set the generator’s main circuit breaker to its OFF (or

OPEN) position.

11. Set the generator's AUTO/OFF/MANUAL switch to

OFF. Remove the 7.5A and 15A fuses from the
generator control panel. Disconnect the battery
cables as outlined in “General Hazards” (page 2).

12. Drain the oil and remove the oil filter. Replace the oil

filter according to Section 3.4, “Changing the Oil

Filter”. Replace the oil with synthetic oil as
recommended in Section 3.3, “Changing the Engine

Oil”.

13. Reconnect the battery cables as outlined in “General

Hazards” (page 2) and insert the 7.5A and 15A fuses
into the generator control panel. The generator is
now ready for service.

2.2

USING THE AUTO/OFF/MANUAL

SWITCH (FIGURE 2.1)

♦ 2.2.1 "AUTO" POSITION_________________________

Selecting this switch position activates fully automatic
system operation. It also allows personnel to start and
exercise the engine every seven days with the setting of
the exercise timer (see Section 2.6). This position also is
used for remote starting, when it is set up.

♦ 2.2.2 "OFF" POSITION

This switch position shuts down the engine. This position
also prevents automatic operation.

Figure 2.1 - Generator Control Panel

OUTLET FUSE

®

■/.'■.A

SYST-rv;

®

OFF MAN.

EXTERNAL

GFCl

Laasit© your neareet: eerviairvs dseler s

tm

set

- LOW OIL

hM rl BMP.

'OVER SPEED

■ OVER CRANK

TIME

I HTLEF.

a

MA

CG

^ 2.2.3 "MANUAL" POSITION

Set the switch to MANUAL to crank and start the engine.
Transfer to standby power will not occur unless there is a
utility failure.

“A WARNING A-

With the switch set to AUTO, the engine may
crank and start at any time without warning.
Such automatic starting normally occurs when
utility power source voltage drops below a
preset level or during the normal exercise cycle.

To prevent possible injury that might be caused

by such sudden starts, always set the switch to
OFF and remove the fuses before working on
or around the generator or transfer switch.

Then, place a "DO NOT OPERATE" tag on the

generator panel and on the transfer switch.

Carrier

Advertising
This manual is related to the following products: