Carrier 30HK User Manual

Reciprocating liquid chillers (60 hz)

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Number One

Airconditioning
Maker

Carrier Parkwav • Syracuse NY 13221

Reciprocating Liquid Chillers (60 Hz)

All 208/230-volt units have extended-voltage

compressor motors.

All units have suction-cutoff unloading

system.

CONTENTS

Page

SAFETY CONSIDERATIONS............................................. I
INSTALLATION.................................................................. 1-6
Step 1 — Inspect Shipment.................................................... 1
Step 2 — Rig and Place Unit................................................. 1

• RIGGING
• PLACEMENT

Step 3 — Check Compressor Mounting

and Connections.................................................................. 3

• SERVICE ACCESS

Step 4 — Make Piping Connections ...................................... 3

• CONDENSER DESCRIPTION
• CONDENSER PIPING
• COOLER DESCRIPTION
• COOLER PIPING

Step

5

— Make Electrical Connections ..................................4

• ELECTRICAL BOX, CONTROL SECTION
• UNBALANCED 3-PHASE SUPPLY

VOLTAGE

• ELECTRICAL BOX, POWER SECTION

START-UP AND SERVICE.................................................. 6
Initial Check............................................................................ 6
Check Refrigerant Charge..................................................... 6

• LIQUID CHARGING METHOD

Check Oil Charge................................................................... 7

• TO ADD OIL
• TO REMOVE OIL

START-UP............................................................................ 7-10
Check Refrigerant Feed Components................................... 7

• THERMOSTATIC EXPANSION VALVE
• FILTER DRIER
• MOISTURE-LIQUID INDICATOR
• LIQUID-LINE SERVICE VALVE
• LIQUID-LINE SOLENOID VALVE
• PRESSURE RELIEF DEVICES
• CHECK VALVE

Check Compressor Protection Devices_

• CIRCUIT BREAKER
• MOTOR OVERTEMPERATURE

THERMOSTAT

• CRANKCASE HEATER
• TIME GUARD® CONTROL
• FOUR-FUNCTION TIMER
• OIL PRESSURE SAFETY

SWITCH (OPS)

Check Unit Safety Devices........................

• SAFETY THERMOSTAT
• HIGH-PRESSURE SWITCH

• LOW-PRESSURE SWITCH

Check Capacity Control System...............

10

DESCRIPTION

3-STEP TEMPERATURE
CONTROLLER

DESIGN SET POINT ADJUSTMENT
CYLINDER UNLOADING SYSTEM

Page

UNIT OPERATION...........................................................10-11
Control Power....................................................................... 10
Control Sequence.................................................................. 11
Unit Stoppage and Restart.................................................. 11
SERVICING COOLER..................................................... 11-13

Tube Plugging ....................................................................... 12

Retubing ................................................................................ 12

Tightening Cooler Head Bolts ............................................. 12

• GASKET PREPARATION
• BOLT TORQUES
• BOLT TIGHTENING SEQUENCE

TROUBLESHOOTING GUIDE....................................... 14,15

SAFETY CONSIDERATIONS

Installation, start-up and servicing of this

equipment can be hazardous due to system pres­
sures,

electrical

components

and

equipment

location (roofs, elevated structures, etc.).

Only trained, qualified installers and service

mechanics should install, start-up and service
this equipment.

When working on the equipment, observe pre­

cautions in the literature, tags, stickers and labels
attached to the equipment and any other safety
precautions that apply.

• Follow all safety codes.
• Wear safety glasses and work gloves.
• Use care in handling, rigging and setting bulky

equipment.

INSTALLATION

Step 1 — Inspect Shipment

Inspect unit for damage or missing parts. If dam­

age is detected, or if shipment is incomplete, file a
claim immediately with the shipping company.

Step 2 — Rig and Place Unit

RIGGING

On each end of cooler, a steel loop is provided for

the preferred method of lifting unit.

Use spreader

bars to keep cables away from compressor enclo*-
sure and control box. If unit is to be moved by fork
truck, use the following methods:

1. From front or rear, lift under the cooler rails.

Unit can be either on or off skid.

2. When moving from ends,

leave unit on skid. Lift

from under skid.

© Carrier Corporation 1983

Form 30HK.HL-10SI