AVE Parallel Device with DB-25 Connectors P-2-RS User Manual

Mave, P-2-rs installation

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

P-2-RS Installation

mAVE

STRENGTH IN THE BUSINESS^

Parallel Device with DB-25 Connectors

The DB-9 to DB-9 cable

hooks the P-2-RS

to the VSI-Pro

DB-9F

DB-9M

This DB-25M Connector

plugs into the P-2-RS

P-2-RS

VSI-Pro

The pin out for the cable between the

P-2-RS and the VSI-Pro is as follows:

P-2-RS DB-9F

3---------------

1------------------------------------

VSI-Pro DB-9M

-----------2

5

The device’s parallel

cable plugs back into

this DB-25M Connector

This DB-25F

Connector plugs

into the device’s

parallel port

Refer to the VSI-Pro Operation Manual for further

instructions on programming your VSI-Pro.

Advertising
Table of contents