Installation Instructions

The M-H pre-wired Control Panel and Protectorelay,
supplied with each assembly may be mounted on
any convenient wall or structure in the boiler area.

See instruction packed with panel. Complete wiring

instructions are furnished with the control box. In

additioDj the wiring diagrams are repeated in this

instruction. Observe local codes and the National
Electric Codes for wiring external of the panel.

*

Electronic Pilot

The electronic pilot should be mounted in place of
the automatic pilot nearest the center of the boiler.

There is e n o u g h wire furnished for the largest

boiler. What wire is not used should be discarded.
Remove the automatic pilot and install the elec­

tronic pilot in its place.

Electronic Control Pilot

MANUAL IGNITION

For Ndturol Gas-D4 Control Group

This Control Assembly consists of two packages:

1. Package - Electronic Control

a. M-H Control Panel including Protecto-relay.

b. Flame Rod wire (hi-temp) 10 feet.

2. Pilot Package

a. M-H Electronic Pilot

b. Wire nut
c. Ground Clamp

Proceed as follows:

1. Mount the Control Panel (see General above).
2. Remove automatic pilot. Install the electronic

pilot in its place.

3. Use the 10 foot length of high temperature flame
rod wire to make electric connection at pilot. Use

14 gauge make up wire to continue the line to the

Control Panel. Make sure a good tight connection

is made. Wire nut is provided. Tape wire to gas

manifold.

4. Ground clamp -Run ¡^14 gauge wire to the Control

Panel ground connection. Tape wire to gas manifold.

(SEE OVER)