Bryant 450D User Manual

Installation instructions, 450d, Bpi|ont

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Installation Instructions

Installation

of

the

Model

450D

Gas

Air

Conditioning

Absorption unit consists of the following steps:

I.

Locate and mount absorption unit.

II. Connect chilled water lines.

III. Electrical connections.

IV. Gas connections.

V. Charge system with water.

VI. Check-out and Operation.

VII. Adjust gas input.

VIII. Balance system.

IX. Purge Non-Condensibles.

Each of the above steps is discussed in detail in this

instruction.

Read

entire

instruction

before

starting

in­

stallation.

Remove four shipping bolts holding absorption unit to

crate base before placing unit on permanent mounting

slab.

NOTE: Unit is shipped with condenser fan guard in­

verted. Remove, place with convex side up and fasten.

I. LOCATE AND MOUNT^ABSORPTION UNIT

The absorption unit may be located at ground level'or

on the roof. Consult local codes for information con­

cerning proximity to property lines, height above roof,

obstructions, etc.

A, MOUNTING BASE '

1. Use non-combustible materials.

2.

Base should be large enough that unit will not

overhang.

3.

Poured concrete slab, minimum 4” thick, recom­

mended for ground installation. On roof installa­

tions a metal plate is satisfactory. Leave 4” to

8” clearance between roof top and metal plate.

4.

Mounting base should not obstruct drain holes

in base angle of unit. Drainage required to dis­

pose of rain, melting snow, etc.

450D

bPi|ont

I

ft

EPN 39450D1

A. G. A. APPROVED

Certified in accordance cvith

A.R.I. standard 2d0—58.

C E R T I F I C A T I O N

A P P L I E S

O N L Y

W H E N

U S E D

W I T H

P R O P E R

C O M P O N E N T S

A S

S P E C I F I E D

B Y

M A N U F A C ­

T U R E R .

B. CLEARANCES

See Figures 1 and 2 for typical locations.

1. Absorption unit should have a

minimum

clearance

of 2 feet on

all

sides from any adjacent obstruc­

tion.

2.

Avoid overhead obstruction. Place unit at least

2 feet from

plumb line of any overhang.

3.

Avoid locating the unit where hot condenser dis­

charge air can impinge on nearby obstruction and

mix with the cooler inlet air. This is particularly

important when two units are placed side by side.

EH 450-2

CANCELS: EH 450-1

EFFECTIVE 12/1/63

Advertising