Bryant 394U User Manual

Bri|ant, P roduct d ata 394u, Gas-fired upflow furnace

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

bri|ant

GAS-FIRED

UPFLOW FURNACE

P roduct
D ata 394U

S

hoot

Series

F

net# I Size

100

PDS 394U.100.5

7/15/70

O)

O)

CO

o

o

CO

O)

o

Q.

(0

Ü
Q.

a

<

u

o

H

Shipping Weights

100-394-E

168 lbs

100-394-L

178 lbs

Clearances from Combustibles
In “large” rooms

6" from casing & vent hood

r from sides & top of

supply plenum

In confined spaces

0" from casing sides, rear,

& bottom

6" from casing front &

type C vent connector

3" from top & sides of un­

insulated supply plenum

The Bryant Model 394 Series F Gas-Fired Forced-

Air Furnace is available in upflow, counterflow, and
basement-type units ranging from 50,000-Btuh to
440,000-Btuh capacity. The 394’s are designed to
accept air conditioning. Cooling coils and housings
styled and engineered to match the 394 are available.

All 394 Furnaces feature Bryant Uniweld (one piece)

casings. The heat exchanger compartment is fully
insulated for maximum operating efficiency, economy,
and quiet operation.

Direct drive blowers are available on sizes 50 through

165, and belt-type on sizes 125 through 220. All moving

parts of both types of blowers are cushioned in rubber.

SUBMITTAL DATA

To further assure quiet operation blowers, each is
electronically balanced.

Bryant slotted, port-type burners ignite and extinguish

quietly. The design is such that the gas flame travels
the full length of the heat exchanger.

Dependable ignition of the main burner is provided

by the pilot and automatic gas control valve. The safety
pilot is the incinerating type and the gas control valve
assures safe operation —it will not operate if gas pres­
sure is too low for proper ignition.

A control center terminal strip speeds installation time.
All internal wiring is completed by Bryant. Field low-
voltage and line-voltage wiring can be completed in
minutes.

Inh Job Location

Engineer Contractor

Submitted by Date Approved by Date

Unit
Size

Qty.

Unit No. and Location

Btuh
Input

Gas

Control

Type

Optional Equipment

Advertising