Ashly pne-c2 User Manual

Ashly pe amplifier, Pne-c2 cobranet module field installation

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Ashly PE Amplifier

PNE-C2 Cobranet Module

Field Installation

1) Remove the four screws

from the standard input as shown.

2) Carefully pull out the installed
standard input assembly, only as
far as shown. Note the ribbon
cable shown furthest left that is

labelled "ST992". Gently remove

this and the other two ribbon cables.

3) The PNE-C2 plugs are in the

same general location as the three
standard input plugs. Plug in the
cable "ST992" first. Be sure to fully
seat each connector, applying
even pressure across the top.

Do not stress the wires.

4) Gently guide the PNE-C2 module

back into the amplifier, and fasten

the four mounting screws.

Remove Four Mounting Screws

aiHPf ^

^

^

. -

••

" J

T i T i i t

r v » - /

i *

I P i

www.ashly.com