PRW 33 PQ Series GM LS Series Shaft Mount Rocker User Manual

Page 1

Advertising
background image

Page 1

PRW Industries, Inc.

1722 Illinois Avenue

Perris, California 92571

Tele: (951) 436-7900

Tech: (888) 377-9779

Shaft Mount Rocker Arm System

Installation Instructions

Small Block Chevrolet Gen III ls1 cylinder heads

3334611/12 Parts List

Item

Quantity

Rocker Arm Stands/Pedestals

2 each

Rocker Arms (Pairs)

8 each

8mm - 1.25 x 19mm Pedestal Bolts

16 each

5/16” Rocker Arm Shaft Bolts

24 each

3/8”-24 Valve Lash Adjusters

16 each

3/8”-24 12 Point Adjuster Nuts

16 each

Rocker Stand Shims ( 2 Thicknesses)

8 each

Shaft Height Gage

1 each

Thank you for purchasing a Performance Quotient® product. PQ

2

Series Shaft Mount Rocker Arm Systems are

engineered and manufactured by PRW Industries, Inc. to maximize valvetrain efficiency for many popular
Chevrolet and other GM, Ford, and Mopar performance aftermarket and racing cylinder heads. CNC machined
billet steel pedestals, centerless ground steel alloy rocker shafts, PRW aviation quality fasteners, and needle
roller bearings comprise the foundation of PQ

2

rocker arms and related systems.

WARNING TO INSTALLER: Installation of this rocker system requires modification of all factory
valve covers, or the use of a valve cover spacer. Stock covers must have the baffle(s) removed in order to
clear this rocker system. Under no circumstance should the rocker system be modified.

PQ

2

Shaft Rocker Arm System Preparation:

Please read these instructions carefully before beginning your installation. Also, take a moment to review the
limited warranty information. If there are any questions or problems during the installation, please do not
hesitate to contact the PRW Customer Service Hotline at 1-888-377-9779, between the hours of 7 a.m. and 5
p.m. PST Monday through Friday.

1) Confirm that all parts are included by comparing to the parts list.

2) Make certain that you have all the tools necessary to complete the project.

3) Assembly lube and/or lubricating oil should be readily available for installation.

PQ

2

Shaft Rocker Arm System Installation:

Step 1: The rocker arm roller tips must be immersed in oil for at least 3 hours prior to installation. This will
allow full lubricant penetration of the roller tip and axle. A disposable aluminum baking pan works well for this
purpose.

NOTE: It is critical to thoroughly pre-oil all shaft rocker components prior to use.

Step 2: Thoroughly inspect both cylinder heads to ensure that there are no obstructions that may impair the
rocker stands from bolting into place on an even plane.

Advertising