Coloronix 6″ RGBW In-Ground Light User Manual

Danger, Warning, Gs series

Advertising
background image

5461 W. Jefferson Blvd. LA, CA 90016

Ph: 888-458-6368 Fax: 888-758-6368

http://www.coloronix.com

(Typical installation. Your installation may differ)

SAVE THESE INSTALLATION INSTRUCTIONS

READ AND UNDERSTAND

THESE INSTALLATION

INSTRUCTIONS BEFORE

INSTALLING FIXTURE!

© Copyright 2015. Specifications subject to change without notice.

Always disconnect power

before wiring, or maintenance.

Danger:

Fixture must be installed by a qualified electrician. Do not install in locations where water collects and/or stands for prolonged

periods of time. Fixture must always be installed according to local and national electrical codes, rules & regulations.

Warning:

The joint MUST be sealed between the mounting surface (i.e. ... wall, ground, ceiling, etc.) and the luminaire

with an appropriate sealing / caulking compound to provide a watertight seal. Seal all opening(s)/conduit opening(s) from water

entry. Before service insure fixture is cool to touch. Always ensure that all gaskets and sealing surfaces are free of dirt and debris.

INSTALLATION INSTRUCTIONS

- Drive over and walk over ratings-

Static load: 5500 LBS maximum

(walk over). Vehicle dynamic load:

55000 Lbs maximum at less than 6

mph (pneumatic tires).

Tools:

M3 hex key/wrench
M4 hex key/wrench

(by others)

GS Series

“In-Grade” LUMINAIRE

Fixture Installation:

NOTE: READ AND FOLLOW ALL INSTALLATION

INSTRUCTIONS BEFORE INSTALLING FIXTURE.

1. Make sure supply wiring is in place before installing

fixture and before completing graded surface and

there is enough wiring to extend outside of the hole

for installing fixture.

2. Remove Block-Out mounting screws from the

stainless steel faceplate and remove Block-Out

Housing from fixture.

3. Place Block-Out Housing (with fixture) in the

ground so that the bottom of the stainless steel

faceplate is at finish grade level.

4. Check to see that hole is at least deep enough for

fixture and underground junction box (by others) (see

FIG. 1), as needed/required.

5. Wire fixture to data enabler.

Red/Black +24DC to V+

Blue/Black -24DC to V-
Green/Black (White) to W-

Blue (Blue) to B-

Green (Green) to G-

Red (Red) to R-

7. Place Fixture in hole and then mount sealed fixture

(with LED’s) to Block-Out housing and secure with

Block-Out mounting screws.

Grade level.

FIG. 1

Grade level.
Shown:
Cord in
underground
junction box (by
others).
Bottom of
Stainless steel
Faceplate at
grade level.

Underground junction box
(by others)

Typical installation. Your installa-
tion may differ. See wiring
instructions for more information.

6. Secure connection using UL Listed wire

nuts/connectors and then with UL Listed Electrical

tape (by others), as required, appropriate for the

connection. If connections are underground an

underground junction box (by others) may be needed

(see FIG.1).

Stainless Steel faceplate. with
housing and cord

Block Out Housing

(2) Block out mounting screws
(flat head cap screws,
M5 x 25mm long) M3 hex key.

(4) socket head screws
(M5 x 10mm long) M4 hex key.
To remove faceplate from housing.

- CAUTION: Fixture MUST be installed to allow for drainage and prevention of water from collecting around and in the bottom of the block-out housing and housing of the

fixture and /or separate junction box (by others, as needed depending on the type of junction box used). A layer of gravel and/or additional drainage material (example:

sandstone, etc.) and/or drainage pipe and/or other system may be needed below and/or around the fixture to prevent water from collecting around and in the bottom of the

block-out housing, housing and cord. A separate wiring junction box(s) (by others) may be needed to complete your installation (see FIG 1 below). Test for drainage by

installing a block-out housing and then pouring water in the hole and to check for drainage and if needed add gravel and/or additional drainage material, or drainage pipe until

there is drainage before pouring cement and installing electrical and the housing and rest of the fixture.

- Install the rough-in-section (block out housing flush at finish grade level - grade finish) of earth, non-organic material or concrete only , and then install housing with stainless

steel faceplate. Make sure organic material is 12 inches away from fixture. Never install bottom of faceplate below or above finish grade level.

- Make sure to keep any and all debris as well as water, snow and/or ice (and salt, etc.) off of top of fixture at all times! Keep glass lens & stainless steel trim clean at all times. Clean

stainless steel with a cleaner specifically designed for stainless steel. - Installation should not be done under high humidity (i.e. Rainy day or after rain, foggy weather... etc.). - If

moisture is observed in fixture, dry fixture thoroughly and operate lamp to remove moisture. - Periodically check lens for cracks, check lens silicone for cracks, worn, torn and/or if it

badly deformed and replace as needed with factory parts only. When installing faceplate center lens and gasket in fixture. - Periodically check screw tightness on trim ring that holds

the lens in place and tighten and clean lens as need.

housing

with LED

driver and

cord.

Hsg

Assy.

(fixture)

Advertising