Installation manual masterline extreme hybrid – HUBER+SUHNER MASTERLINE Extreme Hybrid User Manual

Page 8

Advertising
background image

HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of

tools and accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product

warranty provided by HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these pro-

ducts. For advice concerning the general handling of these products please contact HUBER+SUHNER.

2.

7

Step 20

Store any fibre optic cable over-length inside base

station by using cable over-length storage box which

can be mounted on a wall, panel or mounted horizon-

tally within an equipment rack.

Step 21

Release snap-lock fastener using a screwdriver.

Step 22

Carefully remove protective tube to gain access to

fibre optic tails.

Step 23

Route fibre optic tails carefully and following a smooth

route to their respective connection points. Remove

dust caps of LC connectors and plug into equipment.

Step 24

Do NOT clean LC before connecting them to the

equipment. LCs are factory cleaned and varified to

ensure optimal performance. Cleaning during

installation potentially decreases performance.

INSTALLATION MANUAL
MASTERLINE Extreme Hybrid

Advertising