Installation manual masterline extreme hybrid – HUBER+SUHNER MASTERLINE Extreme Hybrid User Manual
Page 8
HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of
tools and accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product
warranty provided by HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these pro-
ducts. For advice concerning the general handling of these products please contact HUBER+SUHNER.
2.
7
Step 20
Store any fibre optic cable over-length inside base
station by using cable over-length storage box which
can be mounted on a wall, panel or mounted horizon-
tally within an equipment rack.
Step 21
Release snap-lock fastener using a screwdriver.
Step 22
Carefully remove protective tube to gain access to
fibre optic tails.
Step 23
Route fibre optic tails carefully and following a smooth
route to their respective connection points. Remove
dust caps of LC connectors and plug into equipment.
Step 24
Do NOT clean LC before connecting them to the
equipment. LCs are factory cleaned and varified to
ensure optimal performance. Cleaning during
installation potentially decreases performance.
INSTALLATION MANUAL
MASTERLINE Extreme Hybrid