Space Ray LTS Series Two Stage User Manual

Page 14

Advertising
background image

Form #43155040
May 2013

-13-

3.

Assembly the reflectors onto the body section. Leave 3” space between the tube flange and the first

reflector for later mounting of control box and draft inducer.

4.

Place the flanges of the control end reflector flush with the end of the first reflector. Secure by sliding

speed clips onto reflector edges. Evenly space 6 speed clips on sides and top of reflectors to provide a
snug fit. Place foot end reflector on the opposite end of the reflector and secure as above.

Tube Flange

Side View

Suspension

chain

reflector

4

3

3

4

Speed

Clip

5.

Attach the control box to the right-hand control tube flange and secure with 1/4-20 locknuts. The control

box must be mounted with the perforated fresh air plate on top, facing the ceiling.

6.

Attach the draft inducer assembly to the left-hand draft inducer tube flange and secure with 1/4-20

locknuts. A flue restrictor plate is attached to the draft inducer weld studs. DO NOT DISCARD

DO NOT DISCARD

DO NOT DISCARD

DO NOT DISCARD

RESTRICTOR PLATE

RESTRICTOR PLATE

RESTRICTOR PLATE

RESTRICTOR PLATE and make sure this remains in place while the draft inducer is being attached to the
heater body.

1/4-20

Locknuts

Tube Flange

(control)

Gasket

Access

Panel

Control Box

Draft Inducer

(vertical position)

Flue Restrictor

Plate

Do Not Discard.

Gasket

6

Tube Flange

(draft inducer)

5

Advertising
This manual is related to the following products: