Always read the instructions first, Inspection check list, Warning – Allmand Nite-Lite Pro Vertical Tower V Series User Manual

Page 2

Advertising
background image

2

2

INSPECTION CHECK LIST

FOR PREPARING THE NIGHT-LITE PRO FOR DELIVERY OR RENTAL

The NIGHT-LITE PRO requires service as well as proper operation in order to provide the
performance and safety it has been designed for. Never deliver or put a machine into ser-
vice with known defects or missing instructions or decals. Always instruct the customer in
the proper operation and safety procedures as described in the operator’s manual. Always
provide the manual with the equipment for proper and safe operation.

CHECK LIST:
 Visually inspect the equipment to ensure that all instructions and decals are in place and

legible.

 Inspect the tower, pulleys, and cables for proper operation.
 Check the hitch assembly and safety tow chains.
 Check the outriggers and jacks to make sure they operate properly.
 Inspect the light assemblies for damage and test for proper operation.
 Inspect the electrical wiring for signs of damage.
 Check the ground rod cable and the ground lug. Make sure they are clean, undam-

aged, and functional.

Inspect the tires to ensure good condition and proper inflation.

Check oil, fuel, coolant levels, and hydraulic fluid levels.

 Check to make sure the operator’s manual is with the equipment.
 Inspect the machine physically for damage and repair if necessary.

NOTE: See appropriate section of manual for scheduled maintenance intervals.

After completing the inspection check list, operate the tower through a complete op-
eration cycle, following the operating instructions in the operator’s manual.

WARNING

NEVER ALLOW ANYONE TO OPERATE THE EQUIPMENT WITHOUT

PROPER TRAINING!

ALWAYS READ THE INSTRUCTIONS FIRST!

Advertising