N!ERGY PORTABLE CANOPY

Component List: 1 Canopy Top, 1 Frame Assembly, 1 Carry Bag

w/Wheels, 1 Pre-Installed Wiring Harness w/ Switch, 4 Nailhead

Stakes, 4 Guy Out Skewers, 4 Attached Guy Out Cords

NOTE: Do not drop carry bag. Do not bounce the bag on its end to get

the frame out. These actions may damage the electrical components.

Although it is possible to raise this structure by yourself; it is much easier

and faster if you have help.

Rev B 4.09

Expand the Frame:

• Open the carry bag, remove the frame and top. Lay the top aside and

stand the frame up, near its final location

• With one person at

A and another at B, lift the poles and step back to

pull the legs out and away from the center. See fig. 1. Move to

C and D

and again lift and pull the

legs out and away. Work

back and forth between

AB and CD, until the

frame is extended as

shown in fig. 2

• If you are working alone,

pull the frame apart as

best you can and then

drive a nailhead stake

through the hole in the

baseplate of one of the

legs. See fig. 3. Work your

way from corner, pulling

out and away from the

staked leg

• Continue until the frame

is extended as shown in

fig. 2

Raise the Perimeter and

Roof Rafters:

• At each corner, lift the

bottom section of the

perimeter rafter until the

lock button on the leg

clicks into its seat in the

collar. See fig. 4 & 5. Take

care that the collar truly

captures the button,

otherwise the roof will

slide back down.

• Continue with the rest of

the perimeter rafters

until all corners are

locked in place and the

roof is extended as

shown in fig. 6

Secure the Structure to the Ground:

• Drive a nailhead stake through the

holes in the baseplates at the

bottom of the legs. See fig. 12

• Use the skewers to stake

the guyout cords and

adjust tension with the

attached sliders. See fig. 13

Attach the Canopy Top to the Frame:

• Lay the fabric on the ground with the top facing

up and square to the frame.

• Grasp the two canopy corners closest to the frame

and drag them up and over the roof to the frame

corners on the opposite side. Take care that the

electrical plugs do not get caught on the frame as

you tug the canopy

• At each corner, fit the fabric snug to the frame.

Align the guy gusset to the top of the frame and

at a 45˚ angle from the leg. See fig. 7

• Move inside, under the canopy. Wrap each pair of

Velcro® hook pads from the inside corners of the

canopy to the loops near the top of the corner

poles. See fig. 8

• Attach all remaining Velcro® tabs to the perimeter

and roof rafters. See fig. 9

Raise the Legs:

• Station one person

at each leg on one

side of the frame.

Lift the legs and

press the button on

the black collar to

release the inside

section. See fig. 10.

Allow the inside

sections to fall to one of the three lock

points. Make sure that the legs are the

same height and that they are locked in

place. See fig.11

• Repeat with the remaining two legs

YOUR CANOPY IS READY!

green

blue

E! Power System: To use, you will need a power source. Our E! Power Pak™ is sold

separately. Once connected to power, the control will display “green” at any switch

that is “ON” and the “ON” socket will glow blue. See fig 14

Take Down: Pull up all stakes. Release the

canopy’s hook & loop straps and remove

from the frame. You may leave the wire

harness in place. Collapse all poles and stow.

Fold the canopy onto itself, roll up.and stow.

Read the important safety instructions on the

reverse side.