Inside vertical installations, Outside vertical installations - freestanding, Outside vertical installations – Enviro C-10825 User Manual

Page 20: Installation

Advertising
background image

� ��

��� ���

���� ��� ������� ��� ��

�� ����� ��� ����� ���

���� �� ��� ������ ������

���� ��������

���� ������

���� ���� ����

������� ������

������� �����

�������� ���� ����

����� ��� ��� ����

���� �������

�� �

����� ��� ���� �������� ����
�������� � ������ ���� ���
���������� �� �������������

Installation

I

NSIDE

V

ERTICAL

I

NSTALLATIONS

:

1. Choose a stove location that is ideal. See the section “D

ECIDING

W

HERE

TO

L

OCATE

YOUR

P

ELLET

A

PPLIANCE

.”

2. Place a non-combustible hearth pad where necessary.

Figure 17: Inside Vertical Installation.

3. Place the unit on the hearth pad (if

installed on a carpeted surface) and

space the unit in a manner so when

the pellet vent is installed vertically,

it will be 3” (7.6 cm) away from a

combustible wall.

4. Locate the center of the fresh air

intake pipe on the unit. Match that

center with the same point on the

wall and cut a hole about 1 5⁄8” (41

mm) in diameter.

5. Install the fresh air intake pipe.
6. Install the tee with clean out.
7.

I

nstall the pellet vent upward

from there. When you reach the

ceiling, make sure that the vent

goes through the ceiling fire stop.

Maintain a 3” (7.6 cm) distance

to combustibles and keep attic

insulation away from the vent pipe.

Maintain an effective vapor barrier.

8. Finally, extend the pellet vent to go

through the roof flashing.

9. Ensure that the rain cap is

approximately 36” (900 mm) above

the roof.

O

UTSIDE

V

ERTICAL

I

NSTALLATIONS

:

To accomplish a outside vertical pipe installation, follow steps 1 through 5 in the “I

NSIDE

V

ERTICAL

I

NSTALLATIONS

- F

REESTANDING

” section and then finish it by performing the following (refer to Figure 18).

1. Install a tee with clean out on the outside of the house.
2. Install PL vent upward from the tee. Make sure that you install support brackets to keep the vent

straight and secure.

3. Install ceiling thimble and secure the flashing as you go through the roof.
4. Ensure that the rain cap is approximately 36” (91.5 cm) above the roof.

20

Advertising
This manual is related to the following products: