PILOT FLAME CHARACTERISTICS

The correct flame will be blue and will extend beyond the

thermocouple. The flame will surround the thermocouple just below

the tip. A slight yellow flame may occur where the pilot flame and

main burner flame meet.

Figure 17

Oxygen Depletion Sensor Pilot (Figure 16)

When the pilot has a large yellow tip flame, clean the Oxygen

Depletion Sensor as follows:
1. Clean the ODS pilot by loosening nut B from the pilot tubing.

When this procedure is required, grasp nut A with an open end

wrench.

Warning:

Never use needles, wires, or similar cylindrical objects to clean

the pilot to avoid damaging the calibrated ruby that controls

the gas flow.

2. Blow air pressure through the holes indicated by the arrows.

This will blow our foreign materials such as dust, lint and

spider webs. Tighten nut B also by grasping nut A.

MAIN BURNER OPERATION

Figure 18

The main burner operation is MANUAL. The owner must manually

place the main burner in operation. The owner will either select

one, three or five plaques to be in operation. Once the owner has

turned the main burner ON, it will continue to operate until the

owner manually turns the main burner OFF.
Description of Manual Gas Control Knob:
OFF position.
PILOT position.

SR-6

Position 1 Will have one plaque in operation, the input will be

6,000 BTUH (1.8KW/H).

SR-10

Position 1 Will have one plaque in operation, the input will be

10,000 BTUH(2.9KW/H).

SR-18

Position 1 Will have one plaque in operation, the input will be

6,700 BTUH (2KW/H).

Position 2 Will have two plaques in operation, the input will be

12,000 BTUH (3.5KW/H).

Position 3 Will have three plaques in operation, the input will

be 18,000 BTUH (5.3KW/H).

SR-30

Position 1 Will have one plaque in operation, the input will be

8,000 BTUH (2.3KW/H) for Natural gas and 7,000

Btuh (2.1KW/H) for Propane/LP gas.

Position 2 Will have three plaques in operation, the input will

be 18,000 BTUH (5.3KW/H).

Position 3 Will have five plaques in operation, the input will

be 30,000 BTUH (8.8KW/H).