A.7 configuring smart meter using sct 3000 – Honeywell ST 3000 User Manual

Page 89

Advertising
background image

A.7

Configuring Smart Meter Using SCT 3000

Using the SCT to
Configure Smart
Meter Display

You can select an available engineering unit or enter a custom one
including upper and lower limit settings for the smart meter’s digital
readout using the SCT 3000.

To configure the smart meter using the SCT, click on the Local Meter
tab in the ST 3000 device window. Use the information fields on the tab
to select and enter the engineering unit and lower and upper display
limits, if applicable. Refer to the SCT on-line User Manual for more
information on smart meter set up using the SCT.

ATTENTION

The same rules apply for meter set up and the transmitter’s output
conformity selection. See “Transmitter Output Conformity and Smart
Meter Configuration” in Subsection A.6 for details and restrictions.

The smart meter does not have to be installed for you to configure it
through the SCT.

2/05

ST 3000 Release 300 Installation Guide

79

Advertising