Pre-setting and Balancing Flow Through

Valve Body.

Close valve with straight blade screwdriver by turning black

pre-setting ring clockwise.

Fig. 4. Closing valve.

When closed, the position of the screwdriver slot equals pre-

setting zero. Mark the position of the slot with a felt tip pen.

Fig. 5. Mark zero position of screwdriver slot.

Take required value from Table 4. Turn presetting ring

counterclockwise with a straight blade screwdriver to this

position.

Chose value has to be congruent with marking.

Fig. 6. Set pre-setting ring to correct value.

One complete revolution of the black pre-setting ring equals a

pre-setting of 10 (Fig. 7).

Fig. 7. One complete revolution equals a pre-setting of 10.

Table 4. CV Values.

NOTE: Pressure drop (psi) = (flow[gpm]/cv)

2

.

Product Selection

1. Select the installation diagram (from Fig. 4 through 16)

that most accurately represents your equipment and pip-

ing configuration.

2. Use Table 4 to select the combination of controller and

valve that is most suitable based on:

a. Equipment and pipe configuration, see Tables 1 and

2.

b. Flow capacity requirement, see Specifications

section.

IMPORTANT

The T100 and T200 are modulating, not manual shut-

down, valve actuators. Do not use them for hand

shutoff valves.

M22687

M22688

M22689

Pre-

setting

1

2

3

4

5

6

7

Open

3/8 in.

0.29 0.58

0.87

1.16 1.45 1.68 1.80 2.00

1/2 in.

2.15

3/4 in.,

1 in.

2.26

M22690