General Rules:

• SUBTRACT 3 ft. from the total H measurement for each

90° elbow installed horizontally.

• SUBTRACT 1-1/2 ft. from the total H measurement for

each 45° elbow installed horizontally.

• A maximum of three 90° elbows (or six 45° elbows) may

be used in any vent confi guration. Some elbows may be
installed horizontally. See Figure 7.6.

• Elbows may be placed back to back anywhere in the

system as long as the fi rst 90° elbow is a starter elbow.

• When penetrating a combustible wall, a wall shield

fi restop must be installed.

• When penetrating a combustible ceiling, a ceiling fi restop

must be installed.

• Horizontal runs of vent do not require vertical rise;

horizontal runs may be level.

F. Vent Diagrams

H

1

V

1

Figure 7.4

One Elbow

1. Top Vent - Horizontal Termination

V

1

Minimum**

H

1

Maximum

90 Elbow**

2 ft.

610 mm

1/2 ft.**

152 mm

2 ft.

610 mm

1-1/2 ft.**

457 mm

3 ft.

914 mm

2-1/2 ft.**

762 mm

5 ft.

1.5 m

3-1/2 ft.

1.1 m

7 ft.

2.1 m

4-1/2 ft.

1.4 m

14 ft.

4.3 m

H

1

Max. =14 ft. (4.3 m)

V + H Max. = 40 ft. (12.2 m)

See Warning**

WARNING**

Note: There MUST be a 25%
reduction in total H when using
fl ex vent except when using the
simple up and out installation
(see Figure 7.3).

Fire Risk.

• When using SLP-HRC-SS and SLP-HRC-ZC-SS

termination caps on top vented fi replaces, a one
foot minimum vertical vent section is required before

installing fi rst elbow

.

• When using DVP-TB1 termination cap on top vented

fi replaces, a three foot minimum vertical vent section
is required before installing fi rst elbow.

• When using any other cap, a section of vertical pipe (12 inches

minimum) MUST be installed prior to attaching a 90° elbow.